Gemini Robotics ER 2
An embodied-reasoning model that plans multi-step robot tasks, self-corrects, coordinates multiple robots, and is available through AI Studio and enterprise preview.
0 comments · 0 votes
Sign in to join the discussion →
No comments yet. Start the discussion.
Why this model scores 67.9
ER 2 plans and tracks hundreds of decisions over several minutes, recovers from failures, coordinates robots, and has broader access than the VLA tiers. Safety constraint following, human-proximity stops, and retained human supervision lower control difficulty, while physical orchestration keeps autonomy and misuse above general non-embodied models of similar capability.
News tied to Gemini Robotics ER 2
The model score of 67.9 rates this model's risk profile. The overall Doom Index of 67.9 measures the complete temporally weighted evidence record. These values answer different questions.
Each article's current Doom Index contribution is divided equally among the exact models named on that article. This prevents multi-model evidence from being claimed in full on several model pages. Model risk scores use a bounded temporal offset around their technical profile, but never feed back into the overall index.
Google DeepMind releases Gemini Robotics 2 for whole-body and multi-robot tasks
Three new robotics models demonstrated whole-body humanoid control, dexterous manipulation, several-minute planning, self-correction, multi-robot collaboration, and rapid on-device adaptation, with reasoning access available in AI Studio.
- Full item contribution
- +0.15
- Gemini Robotics ER 2 equal share
- +0.05
Model score history
-
R5
Doom Score 67.9
Source-backed model availability audit using the model's existing primary or authoritative catalogue evidence. Exact-version evidence chronology replayed under temporal-monthly-pressure-v4.
12 Aug 2026 -
R4
Doom Score 67.9
Exact-version evidence chronology replayed after run doombench-hourly-news-20260812-142416 under temporal-monthly-pressure-v4.
12 Aug 2026 -
R3
Doom Score 68.1
Exact-version evidence chronology replayed after run doombench-hourly-news-20260812-132112 under fixed-sensitivity-v3.
12 Aug 2026 -
R2
Doom Score 69.1
Full-corpus evidence recalculated after run intensive-backfill-20260811-191225 under bounded-corpus-v2.
11 Aug 2026 -
R1
Doom Score 67.9
Initial source-backed profile for the exact embodied-reasoning release.
11 Aug 2026